Êîìïàíèÿ Òåñëè
automation
electro-equipment
Ãëàâíàÿ Êîíòàêòû Ïîèñê
ïîèñê
Êàðòà ñàéòà Ðóññêàÿ âåðñèÿ
CompanyServicesProducersImplemented ProjectsFeedbackStandarts
    







Svea
SVEA Building Control Systems is one of the leading
manufacturers of LON based building automation
products in Europe. The company is headquartered in
Hamburg. In addition to four sales regions in Germany,
SVEA is also present in the most important European
countries through further representatives.
9B, Uzhnoportovaya, Moscow 115088
Tel./ fax + 7 495 786 4 555, e-mail: info@tesli.com
© 2005—2008 «Tesli»
Development: greenbrown.ru
ßíäåêñ öèòèðîâàíèÿ


Rambler's Top100 Ðåéòèíã@Mail.ru    ïðîäâèæåíèå ñàéòà ïî ýëåêòðèêå è ýëåêòðîìîíòàæó
Several projects implemented in 2004-2005
  • Kalugasnab LLC – complete delivery of switchboard equipment for power supply of the Trade and Entertainment Center “RIO”, total area - 92,000 sq. m., power consumption – 7.5 MW

  • Alstom Power Stavan CJSC – complete delivery of precipitator control stations for blast furnaces for Kant Local Cementing Agents Plant OJSC.

  • KPD Terminal – complete delivery of equipment, works for creating of a power supply system of an establishment, automatic systems for building foundation and roof heating. Total power consumption – over 1.5 MW.

  • Efremovsky GPK OJSC – delivery of electrical switchboard equipment and safety control systems for engineering processes.

  • Street Construction Company – delivery of electrical switchboard equipment, complete electrical wiring works for the Trade and Entertainment Center “Mega – Himki”, Reebok, Gant and Arbat-Prestige boutiques.

  • MTS CJSC – complete delivery of power supply switchboards of automatic transfer switches and switchboards for regional representative offices. A cottage on Rublevskoye Shosse – a completely ready private residential cottage, total square – 2,500 sq. m. (automation of an electrical supply network and a low-power network).

  • GVA Sawyer & Co. – delivery of low-voltage package modules to the cottage settlement of Berezhki-Riviera. Over 7 joint projects of establishments completion.

  • AgroStroiEngineering – complete power supply project, including low-power systems, in the Business and Fitness Center in the city of Schelkovo, total area – 60,000 sq. m.

  • MGSS – delivery of electrical switchboard equipment, 16 distribution cabinets of PR type.

  • FranzTelecom – delivery of electrical equipment for nodal communication service.